Loading...
Agenda Packet TC 10/25/2016 - Supplemental Items Supplemental Item October 25, 2016 AGENDA ITEM NO. 2 Town Council Liaison Updates; discussion of same (Staff): *Parks and Recreation Board, October 17, 2016 Council Liaison - Council Member Philip Shoffner Supplemental Item October 25, 2016 AGENDA ITEM NO. 9 Consider and take appropriate action regarding the award or rejection of bids for the Veteran's Memorial, Independence Park West parking lot adjacent to the Veteran's Memorial, and Harmony Park parking lot; and authorizing the Mayor or his designee to execute all necessary documents (Staff). Supplemental Item October 25, 2016 AGENDA ITEM NO. 10 Consider and take appropriate action regarding the new Trophy Club Town Hall and Police Department facility specific to the review of items that were removed from the original plan and the financial status of available funds (N. Sanders and J. Parrow). OFFICE COPY 10.10.16 DATE Company Fence Inc . W.P. FAX CELL E-MAIL O. C. Project: Steele FreemanTrophy Club Joint Town Hall Name Address Fort Worth, TXTrophy Club, TX City/State/Zip Jon Stiles CFP Estimator Addenda Furnish and install 1 iron track gate for 24' opening. Track gate will have gate operator with 2 safety loops, free exit loopand photo eye. All access controls, power to operator, concrete beam for track, and operator mounting pad by others. Total Cost: $13,850.00 Furnish and install 1 single iron gate for 3' opening with ADA latch. Any access control by others. Special "keyed alike" locks by others. Total Cost: $1,730.00 Furnish and install approximately 271 lineal feet of 8' tall Ameristar iron fence. Total Cost: $18,100.00 Furnish and install approximately 515 lineal feet of 6' tall vinyl coated chain link fence Total Cost: $9,750.00 Furnish and install 1 cantilever chain link gate for 24' opening. Total Cost: $3,950.00 EXCLUSIONS: Core Drilling Grading - Staking/Surveying - Clearing of Fence Lines - Grounding - Permits - Saw Cutting - Concrete Mow Strips Traffic Control - - Engineering - Location of Private Utilities - Bond Premium Locks/Panic Hardware - Overtime Work - Demo of existing fence - Additional (Extra) Mobilizations ($1,500 ea.) SPECIAL NOTE: Above quote includes Robinson Fence standard insurance limits for General Liability of $1,000,000 per occurrence, $2,000,000 aggregate and $5,000,000 umbrella with Workers Compensation limits of $1,000,000. Any other Insurance requirments are expressly excluded form this quote. ESTIMATE DATE: OCTOBER 10, 2016 Lone Star Lifestyles & Landscapes, Inc. 621 N. Main Street, Suite 435, Grapevine, TX 76051 EXPIRATION DATE \[Click to select date\] 817-865-3345 info@lonestarll.com TO John Elkins Steele & Freeman jelkins@steelefreeman.com DELIVERY SALESPERSON JOB PAYMENT TERMS DUE DATE DATE TROPHY CLUB TOWN HALL - PD FACILITY BID ITEM BASE BID QTY RATE TOTAL 7 - Chinkapin Oak 3" Cal 9 - Shumard Red Oak 3" Cal Trees/Plants 1 14,807.62 14,807.62 7 - Southern Live Oak 3" Cal 5 - Cedar Elm 3" Cal Sod Bermuda Hydromulch: cost per/SF 65,890 .1375 9,059.88 Native Seed: cost per/SF Seed * Does not include warranty if without 43,560 .028 1,219.68 irrigation to ensure proper growth. * Soil Topsoil & Hardwood Mulch 1 2,156.00 2,156.00 Decomposed Granite w/Filter Fabric: cost Rock 2,068.65 per/YD 13.51 153.12 Edging Epic Edge Edging: cost per/LF 280 3.30 924.00 Irrigation Irrigation system 1 63,283.00 63,283.00 Irrigation Irrigation sleeves 1 17,931.38 17,931.38 Irrigation Irrigation alternate modifications 1 822.70 822.70 BASE BID $112,272.91 TOTAL 1 Lone Star Lifestyles & Landscapes, Inc. ITEM ALTERNATE 4 QTY RATE TOTAL Remove Remove Bermuda Hydromulch (303.88) Credit 1 (303.88) 1 - Prairie Sumac 3" Cal 1 - Southern Blackhaw 3" Cal 23 - Little Richard Abelia 3 Gal 7 - Japanese Greenleaf 5 Gal 83 - Nandina Moon Bay 5 Gal Add 87 - Rose Carpet Red 1.5 Gal 1 21,712.99 21,712.99 20 - Japanese Spirea 5 Gal 36 - Mexican Feather Grass 2 Gal 1075 - Wintercreeper 1 Gal 25 - Seasonal Color 4" Cont. 423 - Asiatic Jasmine 1 Gal Add Topsoil and hardwood mulch 1 935.00 935.00 $22,344.11 ALT 4 TOTAL ITEM ALTERNATE 6 QTY RATE TOTAL Remove Remove Bermuda Hydromulch (500.37) Credit 1 (500.37) Add Southern Live Oak 3" Cal 3 521.68 1,565.04 Add Western Soapberry 3" Cal 7 521.68 3,651.76 73 - Little Richard Abelia 3 Gal 119 - Japanese Greenleaf 5 Gal 50 - Dwarf Yaupon 5 Gal 1 Add 11,680.71 11,680.71 36 - Coralberry 3 Gal 52 - Mexican Feather Grass 2 Gal 280 Wintercreeper 1 Gal Add Epic Edge Edging: cost per/LF 180 3.30 594.00 Add Topsoil and hardwood mulch 1 1,925.00 1,925.00 $18,916.14 ALT 6 TOTAL 2 Lone Star Lifestyles & Landscapes, Inc. ITEM ALTERNATE 8 QTY RATE TOTAL 3 - Dwarf Yaupon 5 Gal Add 253.30 253.30 3 - Coralberry 3 Gal 1 Add Topsoil and hardwood mulch 1 77.00 77.00 $330.30 ALT 8 TOTAL TOTAL BASE $153,863.46 BID W/ALTERNATES Lone Star Lifestyles and Landscapes, Inc. expressly guarantees that all work performed will be done according to the plans and specifications provided by company with all materials to be true to name and all work done in a workmanship manner according to standard practices in the trade. All trees, plants, and lawns are guaranteed to be alive and viable at time of installation and to remain so for a period of 90 days from installation. All sprinkler and irrigation systems are guaranteed to function properly for one (1) year from installation; however, company accepts no responsibility for variations or deficiencies in function caused by water volume or pressure varying from the prior estimates. All other items installed by company are guaranteed to function properly for one (1) year from installation. In the event any material or living material as guaranteed fails, the company will promptly replace it. The company is in no event responsible for failures of or defects in materials or living material due to the owner's negligence, unreasonable use, lack of proper care or maintenance, or due to adverse weather conditions (including freeze damage to plant material), acts of God or acts of other persons not controlled by the company. THIS WARRANTY IS LIMITED TO THE REPLACEMENT OF MATERIALS, OR IF THIS CANNOT BE DONE PRACTICALLY, THE REFUND OF THE PURCHASE PRICE PAID BY THE OWNER TO THE COMPANY IF THE OWNER IS WILLING TO ACCEPT SUCH A REFUND. THE COMPANY IS NOT LIABLE FOR ANY CONSEQUENTIAL DAMAGES OR INCIDENTAL DAMAGES OTHER THAN INCIDENTAL DAMAGES EXPRESSLY IMPOSED BY LAW ARISING OUT OF THE FAILURE OF ANY PART OF THE WORK DONE OR THE MATERIAL USED ON THE OWNER'S JOB. ALL IMPLIED WARRANTIES, INCLUDING IMPLIED WARRANTIES OF MERCHANTABILITY AND OF FITNESS FOR ANY PARTICULAR PURPOSE ARE LIMITED TO ONE (1) YEAR FROM THE DATE OF SUBSTANTIAL COMPLETION OF THE SERVICES AND INSTALLATION OF THE MATERIALS PROVIDED BY THE COMPANY UNDER THE PROPOSAL AND CONTRACT OF WHICH THIS WARRANTY IS A PART. 3 Lone Star Lifestyles & Landscapes, Inc. Some states do not allow limitations on how long an implied warranty lasts or the exclusion of incidental or consequential damages. So the above limitation(s) may not apply to you. This warranty gives you specific legal rights and you may also have other rights which vary from state to state. To obtain service under this warranty, the owner must contact the company either by mailing a letter or calling collect the number listed at the head of this Proposal and Contract. The company will inspect the owner's premises within ten (10) days of such notification at a mutually agreeable time. After such inspection, if it is determined the warranty service is necessary the company will perform such service at a time agreed upon between the company and the owner at the time of inspection. No informal dispute settlement mechanism exists to resolve disputes which may arise under this warranty. Accepted By: _____________________________ Accepted Date: __________________________ 4 Lone Star Lifestyles & Landscapes, Inc. Alternate #4 - Add an Additional Planting per Drawing L1.4 & L5.1 in Front of Town Hall Alternate #6 - Add an Additional Planting per Drawing L4.2 & L5.2 in Front of the Police Department Alternate #8 - Add an Additional Planting per Drawing L4.4 & L5.4 at Southwest Corner of Site Alternate #4,6,8 - Modify Irrigation per Alternates 4,6, & 8. Alternate #1 - Add Decorative Security Fence & Drive Gate at Staff Parking